top of page
Services

Commercial Extended Aeration Wastewater Treatment Systems

Gainey’s Concrete offers advanced commercial extended aeration wastewater treatment plants designed to provide effective and scalable solutions for communities and large-scale developments. Our state-of-the-art treatment plants serve housing developments of various sizes, supporting capacities from as few as 5 homes to expansive communities of up to 850 homes or 1,000,000 gallons per day (GPD). Manufactured at our Louisiana facility and shipped across the southeastern U.S., our systems are engineered to meet rigorous standards, including TDEC, LDH, LDEQ, and the “Ten States Standards” requirements. Our precast treatment systems can also be installed in stages, making them ideal for phased projects.

Brandon on Plant.jpg

Product Features

  • Scalable Capacity: Serves developments ranging from 5 to 850 homes with a flow capacity of up to 350,000 GPD using our modular tanks and up to 1M GPD using our custom large-capacity tanks. 

  • Compliance and Standards: Engineered to meet TDEC, LDH, LDEQ, and Ten States Standards, ensuring compliance across multiple states.

  • Customizable Installation: Designed for phased installation, allowing for efficient adaptation to project requirements and growth over time.

  • Licensed Installation: Our licensed and insured contracting team provides installation services in Louisiana, adhering to OSHA safety regulations for excavation.

    • ​We provide WWTP installation consulting services to out-of-state contractors who partner with us.

Additional Services and products

Permitting

Permitting.png

Aluminum V-Notch Weir Box

Aluminum V-Noch Weir Box.png

Sample Port for Testing

Sample Port_edited.jpg

Ultra-Sonic Controller and Transducer for Flow Monitoring

Ultra-Sonic Controller.png

Galvanized Barscreen

Galvanized Bar Screen_edited.jpg

Running Tail Line

Running Tail Line.png

Rehabilitation

Blower Cabinet

De-Chlorinator W/ De-Chlorination Tablets

De chlorinator tablets.png

Field Service and Inspection

Laborer with Shovel Illustration.png

SCADA Mission Communication System

SCADA Mission Communication System.png

Water Truck to Fill Tanks on Installation Day

Water Truck.png

Additional Riser Installed to Meet Required Elevation

Precast Concrete Riser Detail Drawing.png
bottom of page