Catch Basins

Precast concrete catch basins are designed to drain excess stormwater and groundwater from paved streets, parking lots, and sidewalks. Gainey’s precast concrete catch basins provide an alternative to poured-in-place or bricked structures. Quality, economy and efficiency are increased by using precast drainage structures. D.O.T.D approved!


“Thanks for having a strong Quality Control program that understands DOTD accepted practice.”

-Alden “Casey” Allen, LA DOTD-Engineering & Operations Manager


Specifications

CONCRETE: Class 1 concrete with design strength of 5000 PSI at 28 days.
REINFORCEMENT: Meet or exceed all requirements of ASTM C-478, latest specifications as well as LADOTD requirements and Precast Catch Basins Specification PC-01.
CASTING: Cast iron frames and grates are available in many different sizes to accommodate your needs.

Need A Catch Basin Insert?

Click above to see our full line of Stormwater Treatment Products


Options

CUSTOM SIZES AVAILABLE!

* Straight base or extended base sections available.

* Riser sections as required.

* Various sizes from 12”x12” to almost any large structure needed.


 Standard Drawing Available:

Typical Specification PDF

 

Gainey’s Facebook Feed

We have a great precast plant...

Here is one of several multi-piece tanks being dry fitted and water tested prior to field installation. We now build above ground sewer treatment systems that can handle the hydraulic loads of above ground installation
... See MoreSee Less

Wednesday August 16th  ·  

View on Facebook

Sterlington 50,000 GPD
Install day 3.....

We get so attached to these systems...

Our guys are claiming "best set of the year"...

We laugh- we hear that every job. These guys are a throw back to quality and pride in one's work- we love them and they are......

Gainey's Material through and through!!!
... See MoreSee Less

Wednesday August 16th  ·  

View on Facebook

Sterlington Sports Complex
This 50,000 GPD for this facility North of Monroe LA is going in quickly. Thanks to our friends at Delta Process for being great partners!
... See MoreSee Less

Tuesday August 15th  ·  

View on Facebook
×
Navigation